Commercial interior execution across all six trade disciplines — self-performed by dedicated Imvera crews throughout the Southeast.
Showing 12 projects
Request a Scope Review
Full ECO Grip commercial flooring installation for a national food service operator. Scope included demolition of existing flooring, substrate prep, certified ECO Grip installation, seam sealing, and drain integration.
ECO Grip installation for a franchise QSR rollout program. 480 sq ft completed with a 3-person crew. Full equipment reinstallation and final compliance check before handoff.
Armstrong healthcare ceiling system installation across a multi-suite medical office buildout. 1,400 sq ft per day with a 2-person crew. Grid leveled and inspected before tile placement.
USG acoustical ceiling installation for a national retail tenant improvement. Imvera re-leveled an existing grid left by a prior subcontractor and brought the scope to inspection-ready in two days.
Full drywall and finishing scope for a commercial tenant improvement. All phases self-performed — hanging, taping, mudding, patching. Smooth Level 5 finish throughout.
Fire-rated drywall assembly for a multi-tenant commercial buildout. UL-listed assemblies installed per drawings with full inspection documentation. Passed first submission.
20-gauge non-structural interior metal framing for a healthcare facility buildout. English-speaking foreman on site. Full PPE. Layout verified from structural drawings before framing started.
16-gauge metal framing for a corporate office partition system. Executed from architectural drawings with full dimensional verification before any board was hung.
Southern Building Products FRP installation for a national food service kitchen. Fast Grab adhesive applied per manufacturer specs. 480 sq ft with a 3-person crew. No trim moldings per scope.
Full FRP wall panel installation for a commercial restroom package. Adhesive and cove base applied throughout. Passed health department inspection first submission.
Commercial casework and Corian countertop installation for a corporate break room buildout. Zero-defect finishing standard. Dedicated installation crew, not shared with other trades.
Full post-construction service for a multi-suite commercial buildout. Scope included punch list execution, joint touch-ups, surface cleaning, screw dimple repair, and final finish coat across all trade scopes — delivered inspection-ready.
No projects in this category yet.